Shipping at the speed of thought.

Experience

20+ years shipping

Stack

iOS · Android · Web · Backend

Status

Available for work

Scroll_

AI-Powered Engineering

Twenty years of production engineering, and now agents write most of the code. You get a team’s pace with my name on it.

Apps you have probably used02

Client work

American Airlines app icon

Airline · Travel

American Airlines

01 / 14

The airline’s flagship iOS app. The home screen leads with AAdvantage status, miles and Loyalty Points, then the next trip as a card you can act on. Booking covers round trip, one way and multi city, with cars, hotels, vacations and cruises behind the same search. Worked on through Five Pack Creative, the agency that staffed the account.

Ratings

1.5M

Stars

4.8

American Airlines app home screen showing AAdvantage status, miles, Loyalty Points and an upcoming DFW to SFO trip American Airlines booking screen with round trip, one way and multi city tabs above origin, destination and date fields
Fig. 01 · 02 App Store
Underdog app icon

Fantasy sports · Sports

Underdog

02 / 14

Senior iOS engineer on the Fantasy app, 1.6M monthly users. I shipped Weekly Winners, rebuilt signup and onboarding, and drove Champions Picks, the location based Pick’em pools that opened the product to audiences the main game could not serve. Also the KYC verification and deposit flows, in-app alerts, Pick’em promos, and the first real test suite the app had, building up test coverage from starting at zero.

Ratings

316K

Stars

4.8

Underdog pick slip with three player projections stacked, each showing a higher or lower rush and receiving touchdown line Underdog matchup screen showing spread, total and moneyline for a Patriots and Seahawks game with pick percentages
Fig. 01 · 02 App Store
Mudflap app icon

Fuel discounts · Navigation

Mudflap

03 / 14

Diesel discounts for owner operators and small fleets. The map prices every truck stop around you, 3,600 of them, so a driver can see what a fill-up actually costs before committing to the exit. Navigation is truck-safe, routing around low bridges, weight limits and restricted roads rather than handing a semi a car's route.

Ratings

4.5K

Stars

4.7

Mudflap map showing per gallon diesel prices pinned across nearby truck stops with a show list control Mudflap search and route view with priced fuel stops across a region and a driver testimonial above it
Fig. 01 · 02 App Store
Dick’s Sporting Goods app icon

Retail · Shopping

Dick’s Sporting Goods

04 / 14

I built Latest Launches, a new product surface driven by remote config so merchandising can change what it shows without shipping a release, and the Preference Center that captures brand, size and color so the storefront has something real to personalize against. Also the Apple Fitness+ offer integration, and the test suites behind both.

Ratings

462K

Stars

4.8

Dick’s Sporting Goods storefront with a greeting, store picker, search and a New Arrivals carousel above category tiles Dick’s Sporting Goods sneaker release screen listing dated Air Jordan draws with entered status and upcoming draw times
Fig. 01 · 02 App Store
LTK app icon

Creator commerce · Two apps

LTK

05 / 14

Lead iOS engineer across both sides of the marketplace, the shopper app and LTK Creator, 30M+ monthly shoppers. I built multi-image and multi-video product posting, which lifted engagement 22 percent. I also drove a snapshot testing effort that took coverage from 10 to 60 percent and cut customer facing bug tickets by a quarter.

Ratings

460K

Stars

4.9

LTK shopper app AI chat suggesting outfit posts for a trip, with real creator posts returned inline LTK creator profile in the shopper app with posts, videos and products tabs above a grid of trending posts LTK Creator post composer with cover selection, caption, products, location and collection rows above a publish button LTK Creator product detail for a carry-on roller showing colorways, commission rate and a copy link action
Fig. 01–02 shopper · 03–04 creator App Store
Spacelift app icon

Home renovation · Lifestyle

Spacelift

06 / 14

Renovation planning for people who do not yet know what their project involves. You walk the space on video, the app turns that walkthrough into a scope of work and a ballpark cost range broken out line by line, and when you are ready to hire it books a call with a vetted general contractor in your area.

Spacelift project screen showing a mapped address, a ballpark estimate range, a project summary and a line by line scope of work Spacelift consultation booking screen with a week of dates and available 30 minute call times
Fig. 01 · 02 App Store
Vella Home Services app icon

Home services · Lifestyle

Vella Home Services

07 / 14

Housecleaning booked like a ride. You pick the clean your home needs, add extras like inside-the-fridge or oven, and lock an exact appointment time rather than a four-hour window. Home details and cleaning notes live on the booking so the cleaner arrives knowing the gate code and the dog’s name, and every past and upcoming clean sits in one list on your iPhone.

Ratings

6

Stars

5.0

Vella home screen with the next scheduled clean and a button to book a new one Vella choose-your-clean screen listing standard, deep and move-out cleans with prices
Fig. 01 · 02 App Store
MyGabb app icon

Parental controls · Lifestyle

MyGabb

08 / 14

The parent side of Gabb’s kid phones and watches. You see where each child is on one map, draw Safe Zones that fire an alert the moment one is crossed, and decide who is allowed to reach the device at all. Chores run as assignable tasks with coin rewards, so the watch earns its keep beyond location.

Ratings

8.2K

Stars

4.5

MyGabb map showing two children located with photo pins, a Safe Zone alert banner, and a list of children with distance and battery MyGabb task list with recurring chores, coin rewards and accept or decline controls for each one
Fig. 01 · 02 App Store
The Chosen app icon

Streaming · Entertainment

The Chosen

09 / 14

The streaming app for the multi-season drama about the life of Jesus. Every season and episode, ad free and with no account required, plus downloads for watching offline, casting to a TV, and subtitles in well over a hundred languages.

Ratings

8.7K

Stars

4.7

The Chosen episode detail showing a Season 6 teaser with share, favourite and download controls above a subtitle language count The Chosen season browser showing Season 5 artwork above its episode list, beside the player with its caption and settings controls
Fig. 01 · 02 App Store
Hogo app icon

Privacy and credit · Productivity

Hogo

10 / 14

Privacy protection turned into something you can actually finish. The app lists every data broker holding your details and you swipe each one away, then it watches the dark web and your transactions and pays out Hogo coins for the actions you complete. A $25,000 fraud insurance plan sits behind it. Worked on through Five Pack Creative, the same agency engagement as American Airlines.

Ratings

584

Stars

4.7

Hogo data broker screen showing an Intelius listing with a Remove My Info action and a Spokeo entry marked removed Hogo fraud insurance plan screen listing a zero dollar deductible and covered ID fraud expenses
Fig. 01 · 02 App Store
Duffl app icon

Campus delivery · Food & Drink

Duffl

11 / 14

I built this one from the ground up and launched it in the US App Store. Fast delivery for college campuses, 10am to 1am, 5k daily users. Store pages, product listings and store switching, the Category Quick Find slider, and Duffl Rank, a gamified loyalty tier built to hold onto customers. Fourteen feature initiatives with product and UX. Coverage went 0 to 80 percent and customer facing bugs fell 20 percent.

Ratings

192

Stars

4.4

Duffl storefront at a UCSB address showing craving-led category tiles and a personalized row of snack items with prices Duffl snacks aisle with crackers and pretzels rows, each item priced, above a review order bar showing five items
Fig. 01 · 02 App Store
Buildertrend app icon

Construction management · Business

Buildertrend

12 / 14

Project management for home builders and remodelers, on the phone that is already in the contractor’s pocket on site. Daily logs carry notes, walk-through photos and equipment against a named job, and the schedule renders as a real Gantt chart with dependencies, so a slipped framing date visibly drags electrical and HVAC with it.

Ratings

5K

Stars

4.5

Buildertrend daily log for a dated job showing notes, a row of walk-through photo attachments and an equipment entry Buildertrend schedule in Gantt view with framing, electrical and HVAC bars linked by dependency arrows across two weeks
Fig. 01 · 02 App Store
QuickTutor app icon

Education · Lifestyle

QuickTutor

13 / 14

A two-sided marketplace for teaching anything: learners browse subjects from physics to dog training, and anyone with a skill can list themselves and get paid for it. A session runs in person or as an in-app video call, so the tutor and the whiteboard arrive on the same screen, with messaging, scheduling and payments behind it.

Ratings

691

Stars

4.3

QuickTutor browse screen: a search field above subject chips for piano and dog training, a featured makeup lesson card, and a row of category tiles for technology, academics and sports QuickTutor video session: a tutor’s whiteboard of physics working fills the screen with the learner in a corner tile and an eight-minute session timer
Fig. 01 · 02 App Store
Gas Monitor Simulator app icon

Education · Reference

Gas Monitor Simulator

14 / 14

Hazardous-gas training without the hazardous gas. The student’s phone becomes a four-gas meter reading CO, H₂S, oxygen and LEL, and the trainer drives those numbers wirelessly from another device — raising a reading until the alarms fire, pushing a question or a gas fact mid-exercise, and watching whether the student reads the meter correctly under pressure.

Ratings

6

Stars

3.8

Gas Monitor Simulator student view: a simulated four-gas meter listing CO and H2S at zero parts per million, oxygen at 20.8 percent and LEL at 0.0 percent Gas Monitor Simulator trainer messages screen: toggles for an audible alert and required confirmation above sendable prompts including speed up, slow down and gas facts about oxygen levels
Fig. 01 · 02 App Store

Screenshots are the current App Store listings, not my builds frozen in time.
These apps have shipped many times since I worked on them.

Built solo03

My apps

Boswell app icon

Meeting notes · iOS companion

Boswell for iOS

Not shipped01 / 03

The iOS companion to the Mac app. Notes and the next few meetings sit on one screen, recording keeps transcribing with the phone locked, and the ask surface queries everything you have ever recorded rather than just the note in front of you. Designed and built, never released. Boswell went on hiatus before it shipped, so what is here is the design work and the iOS target, not an App Store listing.

Platform

iOS

Status

Unreleased

Boswell for iOS My notes screen: upcoming meetings as dated cards above past notes, with an ask anything bar at the bottom Boswell for iOS ask screen: a greeting above suggested questions such as who have I promised to follow up with, and a composer with a microphone
Fig. 01 · 02 · design Not App Store
W8Trackr app icon

Weight tracking · Health & Fitness

W8Trackr

02 / 03

A weight tracker that does one thing and never asks you to make an account. Log a number, see the trend line smooth out the daily noise, watch the gap to your goal close. No servers, no ads, no tracking. Entries live on your device and sync through your own iCloud. It reads and writes Apple Health, so it works with the scale you already own.

Version

v1.3

Requires

iOS 26+

Size

5.7 MB

Released

Jan 2026

W8Trackr dashboard showing current weight, weekly change and goal progress W8Trackr weight chart with a smoothed trend line
Fig. 01 · 02 414 × 900
RepTracker app icon

Daily reps · Health & Fitness

RepTracker

03 / 03

Pick an exercise, set a daily rep goal, tap the day when you're done. The month sits in front of you as a grid of cells that fill in as you show up. Goals climb on their own. Five more reps every thirty days, or whatever pace you set. Rest days skip instead of breaking your streak, and old entries keep the goal they were logged against.

Version

v1.1

Requires

iOS 17+

Size

3.6 MB

Released

Apr 2026

RepTracker main screen showing exercise cards as monthly calendar grids RepTracker weight tracking entry sheet
Fig. 01 · 02 414 × 900

Client and personal builds04

Websites

Online fitness coaching · h2ofit-preview.netlify.app

H2O Fit

01 / 09

A redesign for Chance Waters’ online coaching business, built to replace a site-builder page. It opens on the coach, not the program: my name is Chance Waters, this is H2O Fit, then walks through the method, how online coaching works and client results before every path lands on the application. Dark, full-bleed gym photography, condensed display type and a slow water-light motion behind the hero.

H2O Fit homepage: the headline This is H2O Fit beside Chance Waters sitting on a bench in a gym, with an Apply for coaching button
Fig. 01 1401 × 877

Smoke shop concept · blazy-smoke-concept.netlify.app

Blazy Smoke

02 / 09

A website concept for a CBD, kratom and glass shop in Argyle, Texas. The hero is the shelf: good finds, right here, with a Glass, Cigars and Vapes switcher that swaps the whole image as you browse. Below it, a type-led run through CBD, kratom and accessories, and two actions that matter for a walk-in shop: call to ask what is in stock, or get directions.

Blazy Smoke homepage: the headline Good finds. Right here. beside a shelf of glass pieces with a Glass, Cigars and Vapes switcher
Fig. 02 1401 × 877

Bottled cold brew · sweet-sunday-coffee.netlify.app

Sweet Sunday Coffee Co.

03 / 09

A small-batch cold brew and matcha company out of Argyle, Texas, and a site that sells the bottle before the story: make everyday feel like sunday. The brand runs on two colours pulled from the label, a checkerboard floor, and a flat cartoon bottle that carries the whole homepage. Flavors, ordering and event dates sit one tap away; every path lands on pre-order.

Sweet Sunday Coffee Co. homepage: the tagline make everyday feel like sunday in a wavy blue frame beside a cartoon bottle of cold brew on a lime checkerboard floor
Fig. 01 1401 × 877

Agentic workflow practice · hefted.ai

hefted

04 / 09

The site for a practice that builds agentic workflows inside established companies — the jobs that are too small to justify a project and too big to keep paying a person for. It sells the engagement in four steps rather than the technology: audit where the time goes, put one workflow in production, wire it into the ERP or the mailbox or the nightly file drop already in use, then keep it running with evals, spend caps and a clear line the agent may not cross alone.

Fig. 01 1600 × 904

Thrash cassette label · isaacsaults.com

Isaac Saults

05 / 09

A bootleg tape label built as a website: 4-track thrash demos dubbed by hand and traded, never sold. The archive runs IS-001 to IS-006, each with its own hand-cut J-card, generation and trade status — send two blanks and postage, get two back. The riff on the homepage is not an audio file; it is synthesized in the browser when you press play.

Fig. 01 1600 × 904

Sourdough bakery · Cedar Park

Malu's Bakery

06 / 09

A sourdough bakery site for a hand-baked, one-bake-a-week operation in Cedar Park. The weekly cadence is built in: orders close Monday at 8pm, baking happens Wednesday morning, then pickup or local delivery. The menu carries per-item pricing across artisan loaves, a freshly milled flour sandwich loaf, and focaccia in two sizes. The running total updates as you pick, and the flow ends in an order form.

Malu’s Bakery homepage: a sourdough loaf beside the ordering call to action
Fig. 01 1401 × 877

Mac app marketing · Waitlist

Boswell

07 / 09

The marketing site for Boswell, a Mac app that records and transcribes meetings. Its positioning sits right on the page: the AI notepad that helps you stay focused. Notes without a meeting bot. The site carries a features section, a blog, and a teams section covering volume licensing and centralized billing, and every path on it ends at the same place: the waitlist signup.

Boswell homepage: the headline beside a mockup of the note-taking window
Fig. 02 1401 × 877

Seasonal storytelling · WordPress

Snowball the Elf

08 / 09

A Christmas site for a pair of house elves who get into things. A post lands for each day of December, picking up wherever the last piece of mischief left off, so a family reads it as a running serial rather than a set of one-offs. Fun, mischief, puzzles and prizes is the site’s own summary of itself, and the archive keeps the whole season in one place.

Snowball the Elf homepage: the title over a Christmas tree photograph, above the latest dated post and a recent posts sidebar
Fig. 03 1401 × 877

Student lending · Skills-based education

Meritize

09 / 09

Financing for students in skills-based programs rather than four year degrees. The site splits its two audiences at the top, students looking to fund a program and schools looking to offer financing to their own, and the whole argument sits in one line on the homepage: you are more than your credit score.

Meritize homepage: the Unlock Your Potential headline above an introduction to skills-based education financing
Fig. 04 1401 × 877

Also this page: hand-built static HTML and CSS, no framework and no build step, on a locked two-typeface system.

Got something like these to build? will@saults.io

The exact prompts behind the AI videos05

Prompts

Seedance 2.5 · 24 seconds · 9:16

Rotten Candy Ad

01 / 02

A 24-second single take: a gross macro chew, the scientist pours the product into the patient’s mouth, the camera rides it down the throat and bursts back out through the eye of what the patient has become. Copy, fill the slots, run.

Seedance 2.5 · 16 seconds · 9:16

The Bullet Time Collision

02 / 02

A 16-second single-take street collision that freezes into bullet time on impact, with three product heroes inside the freeze. Reference image order and the slot list are on the page.

Will Saults06

About

Most of my career has gone into shipping apps at that scale. Real users, real deadlines, and real consequences when a call I made three years ago turns out to be wrong. That's where the judgment came from.

Now I work with agents. They write the volume, I stay responsible for what's correct. Getting a model to produce code is the easy part. The work is in the guardrails, the review passes, and the taste that decide which of it survives.

That's why the two apps above exist. Both built solo, start to App Store, in weeks. Twenty years ago that scope was a team and a quarter.

I still care about the same things: clean seams between modules, code the next person can read, a UI that doesn't fight its platform. Speed without those gets you a bigger mess, sooner.

Contact07

Tell me what you're building.

App work, a second opinion on an architecture, or help getting AI to do something useful in your codebase instead of something impressive in a demo. Send me the messy version of the problem. I answer everything.

Or use the form. Both reach the same inbox.